Home / Services / Submission Readiness Review
Before you submit drawings and method statements
Submission Readiness Review
A check that your temporary works or scaffold submission is complete and consistent before it goes to the consultant or main contractor. Readiness and completeness review of the submission documents, scope as agreed.

Express delivery in 3 working days available on request.
What you send
- The method statement
- The risk assessment
- The drawings to be submitted
- Your submission checklist, if you have one
What you get
- A readiness report with missing items
- Inconsistencies between drawings and method statement
- Top actions
- Larger packages: a cross reference table and suggested wording
When to bring us in
Before submission. Drawings and method statement complete and consistent before they go for review.
We look for missing items, drawings and method statements that do not match, unclear roles, and inspection and handover gaps.
Building the register yourself? The Temporary Works Register Template includes the TWC, TWS appointment and permit to load forms, on Payhip.
Fixed price
Price and scope are agreed before work starts. Send the method statement, risk assessment and drawings to info@scaff.ae for a quote.
Ask for a quoteEvery service includes one clarification round after delivery. Where we benchmark, we compare against your project specification and recognised good practice (for example the Dubai Municipality Safety Guide for Construction Works (2026), BS 5975-1:2024, BS EN 12811-1 and NASC guidance). The project specification and UAE authority requirements prevail.
Need a document written or a temporary works package reviewed?
Send a short description and the documents you have. We reply with scope, a fixed price and a delivery date within one working day.
